Two modes, two tracking tools
Air waybill milestones sit in one system and container events in another, often watched by different teams. Nobody sees the combined stock position against the launch date until it is too late to re-plan.
High-value cargo is split between air and sea and launches are announced before the goods land. Navo24 puts both modes and the real arrival dates in one view for planning and for the customer.

Brands whose hardware moves through these lanes
Launch-critical electronics such as phones, laptops, servers and wearables usually leave Shenzhen, Dongguan, Chongqing, Hanoi or Taipei in two streams. A first wave of finished units flies on freighters and in belly hold, built up on PMC pallets and LD3 containers under airline security rules. Volume follows by sea in sealed 40 ft high cube containers, often through Singapore, Tanjung Pelepas, Busan or Hong Kong before the main-line leg to Rotterdam, Felixstowe or Los Angeles. Lithium cells add dangerous goods paperwork on both modes.
Problems start when the launch date is fixed on a carrier's first ETA while the goods sit in two systems owned by two teams. Transshipment adds a second vessel and a second schedule, and a missed connection at a hub can cost a week with no alert. Navo24 gives one timeline of air waybill events, container events, vessel positions and revised arrivals, so planners work to the date the goods will land, not the date first quoted.
Air waybill milestones sit in one system and container events in another, often watched by different teams. Nobody sees the combined stock position against the launch date until it is too late to re-plan.
The first ETA on a booking is a plan, not a commitment, and it moves with blank sailings, port congestion and rerouting. A marketing date fixed to it can fall apart while the goods are still at sea.
A box that leaves Shenzhen for Singapore or Tanjung Pelepas may wait days for its connecting vessel, and the feeder and main-line legs often report separately. A rolled container can look on schedule until the original ETA passes.
Cells packed with or contained in equipment travel as UN3481 or UN3091, with state of charge limits and acceptance checks that can hold a pallet at the airport. High unit values also call for screened, sealed and low-profile handling at every transfer.
AirCargoMCP puts air waybill events from many airlines into one timeline, from acceptance and manifest to flight departure, arrival and delivery. Planners see whether the first-wave units are on the flight they were booked on.
TrackingMCP follows containers across 240+ carriers and predicts arrival from live vessel progress and port conditions rather than the booking ETA. Webhooks and API feeds push changes into the planning tool the launch team already uses.
SchedulesMCP lists sailings, cut-offs and transshipment connections, with carrier on-time reliability. Teams can compare direct and hub routings and judge how much buffer a launch date needs.
World Sea Ports gives depths, maximum vessel size and facilities for 2,900+ ports, including the hubs where electronics are transshipped. This helps explain why a service calls where it does and which ports can absorb delay.
Decide which units fly and which sail, record the booking references for both, and set the launch date against a buffer, not the first ETA.
Add the air waybill numbers and container or booking numbers so air and sea events appear on one timeline.
Check feeder and main-line connections at the Asian hub and act on any rolled or delayed box as soon as the predicted ETA shifts.
Share the revised arrival with warehouse, retail and marketing teams, and book the delivery slot only once the predicted ETA is stable.
Lithium cells and batteries must pass UN38.3 tests and ship as UN3481 or UN3091 with the right packing instruction, and UN3480 batteries shipped alone are limited to 30% state of charge on aircraft.
Every packed export container needs a signed VGM before loading, and a mismatch or missing weight can get a box refused at the terminal.
Containers of high-value electronics should carry a numbered bolt seal to this standard, with the seal number recorded on the bill of lading and checked at each handover.
These industry security standards set rules for warehouses and road legs, and electronics shippers often require them in their logistics contracts.
The chosen rule fixes where risk passes and who books the carriage, which decides who owns the delay when a launch date slips.
Collect the air waybill numbers and the container or booking numbers for each stream and track them in one place. Navo24 combines AirCargoMCP and TrackingMCP data so both modes appear against the same launch calendar.
The first ETA is set at booking and does not account for blank sailings, port congestion, weather or rolled cargo at a transshipment hub. A predicted ETA built from live vessel progress is closer to the real arrival.
Yes, but they are dangerous goods. Batteries packed with or contained in equipment ship as UN3481 or UN3091 under the IATA DGR by air, and as class 9 under the IMDG Code by sea, with UN38.3 test evidence.
Airlines charge on the greater of actual weight and volumetric weight. The IATA standard is 6,000 cm³ per kg, or 167 kg per m³, so bulky retail packaging can cost more than its weight suggests.
The box is moved to a later sailing, and its arrival date moves by the gap between the two departures, often a week or more. Tracking should flag the new vessel and a revised predicted ETA so the launch plan can change.