Crated robots and machinery logistics

Automation and robotics logistics.

Robots and automation equipment ship as high-value crates that are sensitive to shock, tilt and moisture, and they are tied to installation dates at the receiving plant. Navo24 gives shippers and forwarders tracking, schedules, rates, load plans and reference data to plan and follow these moves, without handling the cargo itself.

A factory filled with lots of orange machines

Overview

Robots, machining cells and packaging lines mostly move by sea in 20 ft and 40 ft containers, with oversize crates on flat racks, open tops or, for the largest cells, break-bulk and heavy-lift ships. Urgent controllers, grippers and spare parts go by air, often on freighters such as the 767-300F or 777F. Typical lanes run from Japan, Germany, Italy and China to plants in Europe, North America and Southeast Asia, ending with a low loader or air-ride trailer to the factory floor.

Problems start when crate size or weight is only confirmed at the terminal, when a vessel is rolled or a sailing blanked, and when parts for one commissioning travel on separate bills of lading by sea and air. Schedules, port limits, container tracking and 3D load plans let planners fix the equipment before booking and see which consignments are still missing as the installation date approaches.

What goes wrong today

01

Equipment must be chosen before booking

A 40 ft high cube has an internal height of about 2.69 m and a lower door opening, so a tall crate with an off-centre mass may need an open top or flat rack. Once a crate is out of gauge it also needs a lashing plan, an OOG surcharge and a stowage position agreed with the carrier.

02

Installation dates leave no slack

Riggers, cranes and commissioning engineers are booked against a fixed week, so a rolled booking or a missed air flight moves the whole line start. The cost is rarely the freight rate; it is idle crews and delayed production.

03

Split consignments hide missing parts

One project often ships the robot by sea, controllers by air and fixtures by truck, each with its own reference number. Without a single view, nobody can say whether everything needed for commissioning is on site.

04

Packing, batteries and paperwork add risk

Crates need shock, tilt and moisture protection, ISPM 15 compliant wood and correct weight declarations. Robots with lithium batteries, or controllers shipped as spares, can fall under IMDG or IATA dangerous goods rules and stall a booking if declared late.

What Navo24 gives you

LoadingMCP

Plan crates into the right equipment

LoadingMCP places crates in 3D inside containers and trucks, so height, width and axle load are checked before you request a flat rack or low loader. Planners can compare a high cube against an open top using the real crate dimensions and weights.

  • Test crate height against door and roof limits
  • Check centre of gravity and axle weights
  • Combine crates and spares in one plan
Open LoadingMCP
SchedulesMCP

Book sailings that fit the install date

SchedulesMCP lists sailings, cut-offs and transshipment points, with carrier on-time reliability beside each option. Work back from the commissioning date, add a buffer for discharge and inland haulage, and choose a sailing with margin.

  • Compare cut-offs and transshipment ports
  • Check carrier on-time reliability per lane
  • Work back from the rigger booking date
Open SchedulesMCP
TrackingMCP

Follow every container to the plant

TrackingMCP follows ocean containers across 240+ carriers with predicted ETAs and alerts, via dashboard, API, webhooks or MCP. Project teams can watch each box of a multi-container order and see slippage before it reaches the site.

  • Predicted ETAs for each container
  • Webhooks when status or ETA changes
  • Free-time and demurrage alerts
Open TrackingMCP
World Sea Ports

Check ports for heavy and tall crates

World Sea Ports gives depths, maximum vessel size, berths and facilities for 2,900+ ports. Use it to confirm that the load port and discharge port can handle heavy-lift cargo and the vessel type you plan to use.

  • Depths and maximum vessel size
  • Berths and facilities per port
  • Shortlist ports with heavy-lift capability
Open World Sea Ports

How it works with Navo24

  1. Size the crates and pick equipment

    Enter crate dimensions and weights in the load planner and decide between high cube, open top, flat rack or low loader.

  2. Select a sailing with margin

    Compare schedules, cut-offs and reliability, then book a sailing that leaves buffer before the installation date.

  3. Track all consignments together

    Follow each container and air waybill for the project and watch predicted ETAs against the commissioning plan.

  4. Confirm arrival and release to site

    Check discharge, free time and inland haulage, then confirm the delivery slot with the riggers and the plant.

Rules and standards that apply

SOLAS VGM (Chapter VI, Regulation 2)

The shipper must give the carrier a verified gross mass for every packed container, including crated machinery, before loading, or the box can be refused.

IMO/ILO/UNECE CTU Code

Sets good practice for packing and securing cargo in units, which matters for tall, heavy or off-centre crates that must not shift or tilt.

ISPM 15 wood packaging standard

Crates, skids and bracing made of solid wood must be heat treated or fumigated and bear the IPPC mark, or the cargo can be held or destroyed at import.

IMDG Code and IATA DGR: UN3481, UN3091

Robots, AGVs and spares that contain lithium batteries are Class 9 dangerous goods unless an exemption applies, and need correct declarations by sea and air.

Incoterms 2020 (FCA, DAP, DPU)

The chosen rule decides who arranges lifting, unloading at the plant and transit risk, which should be settled before the install team is booked.

Questions

Which container is best for shipping an industrial robot?

A 40 ft high cube suits crates up to roughly 2.5 m tall, but door openings and the floor load limit still apply. Taller or wider crates need an open top or flat rack, which brings out-of-gauge handling and lashing requirements.

Do I need a VGM for crated machinery?

Yes. Under SOLAS Chapter VI the shipper must provide a verified gross mass for each packed container, by weighing the whole unit or by weighing the contents and adding the tare. Without it the container will not be loaded.

Do wooden crates need ISPM 15 treatment?

Solid wood packaging, including crates, skids and dunnage, must be heat treated or fumigated and carry the IPPC mark for most import markets. Plywood and other processed wood is generally exempt, but check the destination rules.

Can robots with batteries be shipped by air?

Robots and equipment containing lithium batteries are regulated under the IATA Dangerous Goods Regulations, with UN3481 and UN3091 among the entries that may apply. The shipper must classify, pack and declare them correctly, and some airlines restrict them.

How can I tell if all parts for one installation have arrived?

Group every container and air waybill under one project reference and track them together against the commissioning date. Predicted ETAs and status changes show which consignment is late while there is still time to re-plan.